TCD – Solomon Castle Road
TCD required survey support for the bulk earthwork construction of the new main access road for Solomon mine, this also included 11 culverts allowing stormwater to flow under the road.
Project Overview
Survey expertise in practice.
TCD required survey support for the bulk earthwork construction of the new main access road for Solomon mine. This also included 11 culverts allowing stormwater to flow under the road.
DELIVERY
Our role on the project.
- Machine control and guidance for 5 km of bulk earthworks, including updating and redesigning machine models. Support provided for Leica, Trimble and Topcon machines.
- Survey set-out and as-builts for 11 culverts. Some culverts required redesign work to better match the surroundings.
- Aerial surveys of handover surfaces to determine additional rework, scope changes, and provide a final surface model.
OUTCOME
Delivery that makes a difference.
- The work was completed without incident and within budget.
- Aerial surveys identified significant remeasured quantities, resulting in increased scope and claims for TCD.
- Whole project delivered ahead of schedule.