Tanami Road Upgrade

The Tanami Road is 1,077 km long with 753 km remaining unsealed between Halls Creek, WA and Yuendumu, NT.
Project Overview

Survey expertise in practice.

The Tanami Road is 1,077 km long with 753 km remaining unsealed between Halls Creek, WA and Yuendumu, NT. This unsealed section covers both sides of the Western Australian and Northern Territory borders. This section covered 17.5 km.

DELIVERY

Our role on the project.

  • Provide competent engineering surveyors to oversee the civil aspects of the contract.
  • All initial control establishment to be used for the duration of the construction period.
  • All clearing and excavation permit drafting and set out for the Client.
  • Set up and manage machine guidance systems.
  • Road design assistance and proposals.
  • Civil concrete and stabilisation works for floodway construction.
  • Material volumetric surveys.
  • Complete all conformance surveys and provide reports as required for QAQC for the Department of Infrastructure.
OUTCOME

Delivery that makes a difference.

  • The work was completed without incident.
  • Scope was delivered on time and on budget.

Similar projects

Christmas Creek – Vertical WHIMS Facility Upgrade – Bulk Earthworks

Christmas Creek – Vertical WHIMS Facility Upgrade – Bulk Earthworks

Engineering & Construction Surveying

As-Constructed Surveys

View project

TCD – Solomon Queens Conveyor

TCD – Solomon Queens Conveyor

Engineering & Construction Surveying

Survey Control Networks

Monitoring

3D Laser Scanning & Reality Capture

View project