NRW – Altura Tailings Dam

Altura Mining sought to lift their existing Tailings Dam by 8m to accommodate future processing.
Project Overview

Survey expertise in practice.

Altura Mining sought to lift their existing Tailings Dam by 8m to accommodate future processing.

DELIVERY

Our role on the project.

  • Provide competent engineering surveyors to oversee the bulk earthworks.
  • Establish all primary control to be used for the duration of the construction period.
  • Set up permanent base and manage all machine guidance systems – including calibration of all buckets and blades.
  • Material Aerial volumetric surveys.
  • BOQ review and volumetric take offs.
  • Complete all conformance surveys and provide reports as required for QAQC.
OUTCOME

Delivery that makes a difference.

  • The work was completed without incident.
  • Machine guidance was set up and managed for all supplied machines, Topcon, Leica & Trimble.
  • Tracked Volumes weekly using UAS system.

Similar projects

Christmas Creek – Vertical WHIMS Facility Upgrade – Bulk Earthworks

Christmas Creek – Vertical WHIMS Facility Upgrade – Bulk Earthworks

Engineering & Construction Surveying

As-Constructed Surveys

View project

TCD – Solomon Queens Conveyor

TCD – Solomon Queens Conveyor

Engineering & Construction Surveying

Survey Control Networks

Monitoring

3D Laser Scanning & Reality Capture

View project