Improvements along Great Eastern Highway include widening, overlay, realignments, overtaking lanes and bridgeworks.
Project Overview

Survey expertise in practice.

Improvements along Great Eastern Highway include widening, overlay, realignments, overtaking lanes and bridgeworks. Realignment of curves near Carrabin (2018–19). Construction of a new westbound passing lane between Carrabin and Bodallin in the Shire of Yilgarn (2019-20). Widening and overlay of a 5.5 km section of road between Walgoolan and Carrabin and improvements to the intersection with Lindley Road in the Shire of Westonia (2019-20). Widen and overlay a 4.3 km section and a 1 km realignment between Carrabin and Bodallin in the Shire of Yilgarn (2019-20)

DELIVERY

Our role on the project.

  • Provide competent engineering surveyors to oversee the civil aspect of Contract.
  • All initial control establishment to be used for the duration of the construction period.
  • All clearing and excavation permit drafting and set out for the Client.
  • Set up and manage machine guidance systems.
  • Material volumetric surveys.
  • BOQ review and volumetric take offs.
  • Complete all conformance surveys and provide reports as required for QAQC for the Department of Infrastructure.
OUTCOME

Delivery that makes a difference.

  • The work was completed without incident.
  • Machine guidance was set up and managed for all supplied machines, Topcon, Leica & Trimble.

Similar projects

Christmas Creek – Vertical WHIMS Facility Upgrade – Bulk Earthworks

Christmas Creek – Vertical WHIMS Facility Upgrade – Bulk Earthworks

Engineering & Construction Surveying

As-Constructed Surveys

View project

TCD – Solomon Queens Conveyor

TCD – Solomon Queens Conveyor

Engineering & Construction Surveying

Survey Control Networks

Monitoring

3D Laser Scanning & Reality Capture

View project