Deflector Gold Mine

Mine and engineering surveying supporting plant construction, pit development, tailings infrastructure and associated services.
Project Overview

Survey expertise in practice.

Doray Minerals acquired the Deflector Gold Project (Deflector) following its successful takeover of Mutiny Gold Ltd in February 2015. Deflector is a high-grade, gold-copper deposit located in the southern Murchison region of WA, 450 km north of Perth and 160 km east of the Western Australian regional city of Geraldton. It is located 350 km from Andy Well.

DELIVERY

Our role on the project.

  • Provide competent mine and engineering surveyor to oversee the mill plant construction and mine pit and tailings dam development for multiple Clients.
  • All initial mine control establishment to be used for the duration of the mining lease.
  • All clearing permit drafting and set out for the client.
  • Access road construction, design and set out (12 km).
  • Civil concrete works for the mill plant (calculations and set out).
  • Camp construction with associated services.
  • Tailings dam volumetric surveys / design assistance.
  • Tailings pipework from mill plant to tailings dam and mine pit dewatering pipelines (13 km combined).
  • Bore field pipeline installation (8 km).
OUTCOME

Delivery that makes a difference.

  • The work was completed without incident.
  • Scope was delivered on time and on budget.

Similar projects

Christmas Creek – Vertical WHIMS Facility Upgrade – Bulk Earthworks

Christmas Creek – Vertical WHIMS Facility Upgrade – Bulk Earthworks

Engineering & Construction Surveying

As-Constructed Surveys

View project

TCD – Solomon Queens Conveyor

TCD – Solomon Queens Conveyor

Engineering & Construction Surveying

Survey Control Networks

Monitoring

3D Laser Scanning & Reality Capture

View project