Corunna Downs – Feasibility Survey
Atlas Iron Mining sought to have 40 km of existing access roads surveyed together with all relevant features such as culverts and services from Marble Bar to Corunna Downs.
Project Overview
Survey expertise in practice.
Atlas Iron Mining sought to have 40 km of existing access roads surveyed together with all relevant features such as culverts and services from Marble Bar to Corunna Downs. This was to form part of their feasibility study into developing the route for the purposes of hauling ore to their existing plant.
DELIVERY
Our role on the project.
- Provide competent engineering surveyor to oversee the survey.
- All initial control establishment to be used for the duration of the works.
- Access road survey (40 km via vehicle mounted GPS accuracy 50 mm vertical).
- Survey all existing services (20 mm vertical).
- Survey all existing culverts and natural floodways (20 mm vertical).
OUTCOME
Delivery that makes a difference.
- The work was completed without incident.
- Scope was delivered on time and on budget.