Civil construction site with reinforcement and lifting equipment.
our approach

Nacap – Agnew Windfarm

Culhig Surveying have recently been engaged by Nacap Pty Ltd to assist with the construction of an 18 MW wind farm as part of the EDL Agnew Hybrid Renewable Power Station which supplies the Agnew Gold Mine near Leinster in WA.
Project Overview

Survey expertise in practice.

Culhig Surveying have recently been engaged by Nacap Pty Ltd to assist with the construction of an 18 MW wind farm as part of the EDL Agnew Hybrid Renewable Power Station which supplies the Agnew Gold Mine near Leinster in WA. This latest Contract extends our involvement in a landmark mining project with a big emphasis on going “green”, as this is the first mine in Australia to be powered by a wind, solar, battery and gas microgrid.

DELIVERY

Our role on the project.

  • Carried out the following survey works.
  • WTG foundations.
  • Access roads.
  • Sediment and erosion control.
  • Drainage.
  • Radiator (kiosk) foundation at WTG.
  • Access platform foundation.
  • Hardstands (including blade laydowns).
  • Substation foundations and switchyard bench and drainage.
  • Machine guidance data management.
  • Electrical trenching and installation.
OUTCOME

Delivery that makes a difference.

  • The work was completed without incident.
  • Culhig added valuable insight to the earthworks package and its redesign.

Similar projects

Christmas Creek – Vertical WHIMS Facility Upgrade – Bulk Earthworks

Christmas Creek – Vertical WHIMS Facility Upgrade – Bulk Earthworks

Engineering & Construction Surveying

As-Constructed Surveys

View project

TCD – Solomon Queens Conveyor

TCD – Solomon Queens Conveyor

Engineering & Construction Surveying

Survey Control Networks

Monitoring

3D Laser Scanning & Reality Capture

View project